Concentrator iES - LM10J
The concentrator is equipment that is installed on the powerdistribution site in the station area, used for collection of the data ofvarious collectors or electric energy meters for centralized processing andstorage, at the same time, carries out centralized data exchange with themaster station or handheld equipment.
The maintechnical indexes of the concentrator are as follows:
Items | Technical indexes |
Number of meters supporting | Type 1: 2040 pieces; |
Collection period | 1min ~ 24h, can be set |
Clock precision | ≤±0.5 s/d |
Clock battery | 3.6VDC,1.2Ah |
Sampling precision | Voltage and current: 0.5; power: 0.5 |
Power source: | Type I: three-phase four-line 220/380 V, allowable deviation: -50% ~ + 40%. Type II: single-phase 220V, allowable deviation: -20%~+20% |
Whole-system power consumption | Type I: active power ≤10W and apparent power ≤15VA under non-communication state. |
Working conditions | Work temperature:-45℃~+70℃, relative humidity:≤95%,working air pressure: 63kPa~108kPa |
Safety measures | Lead sealing, command, hardware safety module; |
Installation mode | Wall mounting type I: 290mm×180mm×95mm (height * width * depth) |